Setting Up and Structure

Setting Up Premises

Premises decisions look like property decisions and are not. **Space determines visa quota**, the tenancy registration gates the trade licence, and civil defence approval gates occupation. Take the space before understanding those three and the business can find itself licensed, tenanted and unable to hire.

Download as Word5 pages20 KBFree
[HEADER — replace with your organisation’s letterhead, if used]

Setting Up Premises

From lease to occupation

Premises decisions look like property decisions and are not. Space determines visa quota, the tenancy registration gates the trade licence, and civil defence approval gates occupation. Take the space before understanding those three and the business can find itself licensed, tenanted and unable to hire.

ItemDetail
Company[COMPANY NAME], [licence] [NUMBER]
Jurisdiction[Mainland / free zone / DIFC / ADGM]
Premises[UNIT, BUILDING, AREA, EMIRATE]
Area[NUMBER] sq ft
Visa quota supported[NUMBER]
Headcount planned over the lease term[NUMBER]
Permitted use[MUST MATCH THE LICENSED ACTIVITY]
Lease term[DATE] to [DATE]
Registration (Ejari / Tawtheeq)[NUMBER], dated [DATE]
Civil defence approval[NUMBER], dated [DATE]
Occupation date[DATE]

1. Before Signing the Lease

#CheckWhyDone
1Space supports the visa quota you will needQuota is linked to area and premises type[Y/N]
2Headcount modelled across the whole lease termNot just today[Y/N]
3Permitted use matches the licensed activityThe licence depends on it[Y/N]
4Premises approved by the authority for that usePlanning and municipality[Y/N]
5Landlord is the registered owner or authorised to leaseOtherwise registration fails[Y/N]
6Lease will be registrableNo registration, no licence renewal[Y/N]
7Service charges and chiller costs quantifiedFrequently a large extra[Y/N]
8Fit-out permitted, and the approval route understoodLandlord, municipality, civil defence[Y/N]
9Reinstatement obligation pricedIt arrives at the end and is rarely budgeted[Y/N]
10Rent-free fit-out period sufficient for approvalsApprovals are the usual delay[Y/N]
11Parking, access and building hours adequate[Y/N]
12Total occupancy cost modelled, not headline rent[Y/N]

2. Options

Generated from www.helionerp.com1

4 more pages in the Word file

This is page 1 of the Word document, exactly as it appears when you open it. Fields shown like THIS are placeholders for you to complete.

Notes for use

These notes accompany the template and explain the drafting choices, the compliance points and the mistakes most often made with this document. They appear as a final page in the Word file, intended to be deleted before the document is executed.

Space determines how many people you can hire

Mainland visa quota is linked to the area and type of premises. A company that minimises space to control cost, then needs to hire, finds the quota unavailable with years left on the lease. Model headcount across the full lease term before signing.

Registration gates the licence

Ejari, Tawtheeq or the zone equivalent is required for trade licence issuance and renewal. An unregistered or unregistrable lease blocks the licence, which blocks the establishment card, which blocks every visa transaction.

Match permitted use to the licensed activity

The use permitted under the lease, the approved use of the premises and the activity on the trade licence must all correspond. A mismatch surfaces at renewal or inspection and is expensive to fix from a signed lease.

Verify the landlord’s title

Confirm they own the property or are authorised to lease it. Taking a lease from a head tenant whose own lease prohibits subletting leaves you without the registration the licence depends on.

Civil defence and municipality are separate

Two regimes, two inspections, two sets of requirements. A certificate from one proves nothing about the other, and occupation generally cannot proceed without civil defence approval.

Order telecoms at lease signature

Installation lead times are long and cannot be compressed by paying more. This delays more move-ins than fit-out does, and it is entirely predictable.

Photograph the premises at handover

Photographs and video, agreed with the landlord in writing and filed with the lease. It costs nothing at the start and settles the reinstatement argument at the end, which is otherwise a dispute about memory.

Price reinstatement before you fit out

Most commercial leases require the fit-out to be stripped out and the space restored. Building something expensive to remove without budgeting the removal creates a cost that arrives three years later.

Ask for reinstatement requirements early

Two months before expiry, in writing. Verbal assurances that the fit-out can remain evaporate at handover, and by then there is no time to negotiate or to do the work.

Model total occupancy cost

Service charges, chilled water or air conditioning, utilities, insurance and parking can add materially to headline rent. Businesses budget the rent and are surprised by the rest.

A flexi-desk is a real constraint

It is a legitimate starting point, but it caps hiring, and banks and counterparties conducting diligence read it as low substance — which also affects a QFZP claim, tax residence and account opening.

Overlap leases when moving

A gap between premises means no registrable tenancy, which cascades into the licence and then into visas. The saving on a month’s rent rarely justifies the risk.

Recover post-dated cheques on exit

Cheques given to a landlord for rent remain a live liability until returned. Retrieve every one at the end of the lease and obtain written confirmation that none remain outstanding.

Diarise the notice date, not the expiry

Leases with long notice periods renew automatically while nobody is watching. By the expiry date the decision has already been made for you.

Current as of

Reflects UAE requirements current as of {{DATE OF USE}}. Registration systems, visa quota rules, municipality and civil defence requirements, signage approvals and rent frameworks differ by emirate and free zone and change — confirm with the relevant authority before committing to premises.

This is a ready-to-use template provided for convenience. Laws and requirements change, and every situation is different — please have it reviewed by a qualified professional (a lawyer, corporate secretary, or accountant as relevant) before you rely on it.